Alcohol Plant in Barby

Construction of an Alcohol Plant comprising fermentation unit and distillation and rectification unit.


Services provided:

  • PDMS modelling of equipment according to vendor drawings (pumps, heat exchangers, various tanks, mixers, distillation columns and other equipment on the project)
  • Checking of vendor drawings and recommending required modifications
  • Checking of P&ID's and recommending required modifications
  • PDMS piping design
  • Communication with pipe stress calculation department for required piping routing modifications
  • PDMS design of civil infrastructure to accommodate facility (building walls, steel structures and others as required)
  • Preparation of general arrangement drawings
  • Preparation of piping arrangement drawings
  • Preparation of piping isometrics

 

Key data:

  • Design capacity of about 143 m3/24 hrs.