Cogeneration Power Plant EL-TO
Purpose of the Cogeneration Power Plant EL-TO is safe and
reliable supply of heat for the district heating network, technological steam
and electricity.
Services provided:
- Establishment
of Ebsilon@Professional model
- Establishment
of Excel interface for hourly off-design calculations
- Heat
and mass balance calculations
- Calculation
of plant performance (on hourly basis)
- Calculation
of plant revenues and costs (on hourly basis)
Key data:
- One
(1) extraction back-pressure steam turbine, rated power 12 MW
- One
(1) extraction condensing steam turbine, rated power 20 MW
- Three
(3) high pressure steam boilers, rated steam production 98 t/h each
- High
pressure steam temperature: 510 °C
- High
pressure steam pressure: 110 bar
- One
(1) low pressure steam boiler: rated steam production 68 t/h
- Low
pressure steam temperature: 235 °C
- Low
pressure steam pressure: 17 bar
- Five
(5) regenerative hot water heaters, heating output 32 MW each
- One
(1) steam turbine condenser, cooling output 30 MW
- Two
(2) gas fired hot water boilers, heating output 116 MW each
- Technological
steam: 15,5 bar, 225 °C
Time period: 2015