WWTP Knin
Water Supply and Sewerage Improvements and Construction of Waste Water Treatment Plant in the Municipality of Knin (supply of Operational and Maintenance Equipment). The final capacity of the WWTP for the city of Knin is 25000 PE with primary, secondary and tertiary treatment. For stage I the WWTP capacity is 20000 PE.
Services provided
- Preparation and systematization of as-built documentation
- Translation of Trial Operation Plan
- Translation of Process Control and Optimization Philosophy
- Translation of Training brochure (Health & Safety)
- Translation of Training brochure (Process Training)
Key data
- 2 identical processing water
lines, each line is sized to hydraulic load of waste water treated of 44 l/s,
and organic load of 10.000 population equivalent
- 1 common sludge line with simultaneous
aerobic stabilization, mechanical thickening, mechanical dewatering and sludge
disposal
- Plant components: Influent
pumping station with screw pumps, Structure with fine screens, Septic sludge
reception station, Aerated grit chamber, Sand classifier, Open channel for flow
Measurement, Chemical dosing, Anaerobic Bio-P removal reactor, Bioreactors,
Distribution chamber, Secondary clarifiers, Sludge return pumping station,
Outlet structure and flow measurement, Supernatant tank and pumping station,
Excess sludge pumping station, Sludge thickening and dewatering unit, Sludge
storage
Time period: ongoing, from 2018 onwards